5-minute toolbox talk

Electrical and lockout: kill it, lock it, prove it

Updated

Why it matters: Electricity, hydraulics, compressed air, springs and steam can all be stored in a machine that looks off. If that energy releases while you are working on it, the injuries are often severe or fatal.1

Electrical and lockout: kill it, lock it, prove it

Before you start

Bring a lock, a tag and a hasp to the talk and walk through a real lockout on a piece of your equipment, start to finish. Read the key points out loud, then let the crew answer the questions. It takes about five minutes.

Key points

  • Before you service or clear a machine, shut it down and isolate every energy source, not just the main switch.
  • Put your own lock and tag on the disconnect. Your lock, your key.
  • Release stored energy: bleed pressure, block parts that can fall, let things cool.
  • Try to start it before you touch it, to prove it is dead. Then return the controls to off.
  • Treat overhead lines and unknown wiring as live. Look up before you raise a ladder, boom or long material.

On your crew

  • Millwright: Conveyors, gearboxes and presses store energy in springs, belts, gravity and air. Block or release every source before reaching in to change a part or clear a jam.
  • Process operator: Pumps and lines can stay under pressure after the motor is off. Isolate the valves, bleed the line and verify zero energy before you open anything.
  • Electrician: Test before you touch. Check the meter on a known live source, test the circuit, then check the meter again.
  • Linework: Overhead lines can be back-fed or re-energized. Treat every line as live until it has been isolated and grounded under the crew's procedure.

Talk it over

  1. What equipment on this job stores energy even after it is shut off?
  2. Who has the locks and tags, and does everyone have their own?

On the job

OSHA describes how this goes wrong: a jammed conveyor suddenly releases and crushes the worker clearing it, or a steam valve opens and burns workers repairing a connection downstream.12

Free printable sign-in sheet

Fill in the top on your phone or by hand, then print. The talk prints first, and the sign-in sheet starts on its own page.

Toolbox talk sign-in sheet

#Printed nameSignature
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

By signing, each worker confirms they attended this talk. Keep this sheet with your job records.

A fresh talk for your crew

Founding employers on the Tough and Dirty crew board get a new toolbox talk every Monday, with the sign-in sheet ready to print.

Get a new talk every Monday in your crew dashboard

Next talk

Silica dust: cut wet, vacuum, do not dry sweep · All 12 toolbox talks

Sources

  1. OSHA: Control of Hazardous Energy (Lockout/Tagout), checked Nov 19, 2026
  2. OSHA: Electrical, checked Nov 19, 2026

Estimates, not promises. Rules change; check with the employer and the agency.